Location: Aldersgate
Contract Value: £1,100,000
The project encompassed extensive concrete-related tasks across all floors of the building. Beginning with concrete works, meticulous attention was given to pouring and shaping the material to form sturdy floors. Reinforcement was strategically placed within the concrete to enhance structural strength and durability, ensuring the floors could support the intended loads effectively.
Formwork was used to create molds and supports that held the concrete in place during the curing process, ensuring uniformity and precision in the floor construction.
Structural floor infills were carefully executed to fill in voids or gaps within the floors, enhancing their stability and usability.
These infills were essential for optimizing the structural integrity of the building and ensuring a smooth and level surface throughout all floors. Each step of these processes was carried out with a focus on quality and adherence to safety standards, contributing to the overall success and reliability of the construction project.