Location: London
Contract Value: £2,800,000.00
The project involved consolidating four buildings into one cohesive structure, necessitating the creation of new structural openings across all levels.
This included reducing the basement floor area and demolishing the roof down to level 5. New steel installations were crucial for creating levels 5 and 6. Additionally, existing lift and stair cores were demolished to make way for two new lift cores and extensions to two existing stair cores. These extensive modifications were aimed at transforming the buildings to meet modern standards and spatial requirements effectively..
These efforts were integral to enhancing the building’s functionality and structural integrity, accommodating new design requirements and optimizing space usage efficiently.